At King’s Hall Leisure Centre in Hackney, our engineers and heritage consultants are delivering a major refurbishment and deep retrofit of this Grade II listed Victorian bath house, to meet current user requirements whilst significantly reducing operational carbon emissions.
Marble Arch House employs a progressive approach towards sustainability with brise-soleil on the west façade to reduce overheating, balanced with high levels of natural daylight to reduce artificial lighting use. The long-term sustainability strategy allows for passive ventilation solutions to be implemented in the future. The office building achieved BREEAM Excellent, with 40% lower carbon emissions than was required at the time.
1
2
Previous
Next